Arrowhead Load Management 2/8/2019

Arrowhead Electric Cooperative will be conducting Dual Fuel Load Management control today: Friday, February 8, 2019.

Interruptible/Dual Fuel Control: 5:00 – 10:00 PM

Water Heater Control: 4:30 – 10:00 PM

This control applies to dual fuel and water heater members – All Members can contribute by keeping their usage low during peak times.

You can check Great River Energy’s load management schedule online at http://lmguide.grenergy.com/.

Please contact Arrowhead Cooperative if you have questions: 218-663-7239 or 800-864-3744.

Leave a Reply