Interruptible Heating Equipment TEST – Thursday, November 1, 2018

Arrowhead Cooperative will be conducting one of our annual Interruptible Heating Equipment Tests on Thursday, November 1, 2018. This test will be performed from 6pm-9pm. During these hours, your back-up heating system should operate. The purpose of this test is to ensure you are prepared for the heating season – please let Arrowhead Cooperative know if your interruptible or dual fuel system does not operate as you expected.

You can always check GRE’s load management schedule online at http://lmguide.grenergy.com/.

Leave a Reply