LOAD MANAGEMENT TEST – Arrowhead Load Management Control Test 10/12/19

Load Control TESTING.

Arrowhead Electric Cooperative will be conducting TEST of the Load Management system: Saturday, October 12, 2019

Interruptible/Dual Fuel Control: 6:00 – 9:00 PM

Peak Shave Water Heater Control: 6:00 – 9:00 PM

This control applies to interruptible heating / dual fuel and interruptible water heater members.

This system test is to help member identify if their heating systems are controlling and responding properly for the heating season.

Please contact Arrowhead Cooperative if you have questions: 218-663-7239 or 800-864-3744.

 

Comments are closed.